Our personal links

Hereunder are some of our yolasite links,
http://manneedsgod.co.uk,http://frankmenchise.com,http://diybrickwork.com,
Here are our blog links,

Thursday, February 11, 2021

Completing the house brick base

Dear readers, we are writing these posts, because we want to write some D.I.Y. Brickwork and building posts, so that you can learn something about how to built something yourself, at least in
theory. So, keep reading please. 
You are here, http://oldman-lifeworks.blogspot.com

My other sites; http://frankmenchise.com,http://diybrickwork.com,http://manneedsgod.co.uk  

Anyhow, you can see our entire articles at this addresses, DIY brickwork  

 and,  http://diybrickwork.com



This is a typical average affordable timber house, set on brick-base. These houses seem to be build for just normal working families. This base here is not like the base in the text, because in the text we are building on a sloping site. But we do not have a photo to show you

Welcome to our article completing the house brick base, from, House brick base continues

Dear readers, this article is the continuation of Building a brick base, where we were going to explain step by step how to build a house brick base, so that, anyone can follow how is done. They can also use what they have learned to build something else.

Anyhow, in our last article, we have started to describe how to build a brick base on a sloping building site, we had reached the stage, where the bricklayers had set-up and built the southern wall high enough to lay some brick reinforcement and the damp course. Now, to keep our descriptions simple and accurate, we must assume that they are leaving an opening for a door, then continue to build this wall as high as the first brick on the concrete foundation at the highest corner. They need to do that, so, they can check and make sure that all the walls are level and there is no mistake in the level of the brickwork. Anyhow, once the bricklayers have done that, it starts to be easier for everyone to work on this brick base, since the whole house dimensions have been set-up, and everything is level.

Now let me make it clear, to start a house base on a stepped foundation is not easy, and the bricklayers must be careful and make no mistakes, especially on a sloping site and stepped foundations, since the foundations may not be level, because of the extra difficulty that the concrete worker encounter when laying the foundations on a sloping site.

Anyhow, when building every tradesman must rely on their skills, they must make sure that what they are doing is the right thing to do, they cannot blame somebody else for their own mistakes, therefore, when they find a mistake from the previous tradesman, whether they are concrete workers or other trades, whenever possible they should try to fix whatever there is to fix themselves, when that cannot be done, their foreman can recall the previous tradesman to fix their mistakes, before they go ahead and make the mistake bigger and more costly to fix later.

That is why the bricklayer cannot trust blindly the concrete workers. Anyhow, the bricklayers that are building this brick base are doing the right thing. They have built the lower part of the brick base level and they have made the first full course of bricks all around the house base. Now they can relax a bit, as everything is in the right place at the right level and there is no pig in the brickwork, as the last course of bricks makes a full circle of the house and ends up level, so, there is no pig in the brickwork, now, let us explain what is a pig in the brickwork and how it can happen.

------------------------------

Explaining a pig in the brickwork

Let me explain how a pig in the brickwork can happen.

Here I need to say that this saying, can be a local saying that explains; the brickwork is set in a way like a spring coil, so it never ends, and it cannot be level

Now let me explain how it can happen, and how the bricklayer can create a pig in the brickwork.  This mistake can happen on a sloping site, like the sloping site we are working on now. It can happen when the brick-walls are not exactly level, and the bricklayer ties the line on the wrong course of bricks, when they start building the last wall.

Therefore, let us go back to build our brick base, and let us assume that the bricklayer that is setting the wall on the eastern side is having some difficulty in setting the wall exactly level, because the foundation is not level, so, the bricklayer believe that he can make the walls level,  by making the bed joint thicker before he reaches ground level; therefore, he lets his northern corner be a couple of centimetre lower than his southern corner on the same course of bricks, you see this is a long wall and if you only use the spirit level, you can hardly see that it is not level, but with the proper level or water level it will show the difference.

At the same time, the bricklayer that is setting the western wall is having some difficulties too and for the same reason is starting his wall and letting his northern corner be a couple of centimetre higher that his southern corner on the same course of bricks, he also believes that he can set everything right by making very small joint before ground level is reached.

Now, there is a difference of four centimetres at the northern wall, this is a problem, you see, four centimetres is more than half a brick, therefore, the bricklayer can easily tie the line on the wrong course; this is how a pig in the brickwork is created.

To make sure that there is no pig in it, the bricklayer needs to make sure that the walls are started level from the start, and then run a full course all around the entire building. The brick course should be like a closed even ring, and make sure that the walls are level, this is the only way to avoid mistakes. So, it is better to spend extra time at the start and get it perfectly level. I hope I have explained it properly and clearly, how a pig in the brickwork can be created.

-------------------------------------

Building the rest of the brick-base.

Let us assume that everything has been set properly, so, all the brickwork around is level and at the right alignment. But to make sure, we double check everything again by running a type measure and seeing that it agrees with the plans measurement, this now is a very simple job, because everything is set in hard cement and everything is level, so, if there is any mistake in the measurements it will show up easily.

Having checked everything and found that everything is right, we can proceed to complete the brick base. Anyhow, we have built the lower part of the base one brick higher than the highest corner of the concrete foundations.

Since the whole base has been set, the best way is to build higher the northern wall, which is now the lowest wall, we want to build it at least to above ground level, so that the trances can be back filled and then it is easier for everybody to walk around the building site, this is an easier job now since everything is in the right place at the right level. So, we build this wall above ground level. Having built the northern wall above ground level, now we must choose which wall to build next. But at the same time, let us see what the bricklayer can use to speed up the brickwork, like the bricklayer’s profiles, these are devises that can be attached to the brick walls to help the bricklayers. So, let us explain the bricklayer’s profiles.

--------------------------------------------- 


This picture shows you how some bricklayers profile look like, they help because you can save time. 


Bricklayer's profiles

Bricklayers’ profiles are helpful, because it eliminates the process of building the corners first, it also helps to keep the gauge easily, since the gauge is marked on the profile. I have always had a profile with me when I was laying bricks. Some of these profiles can be bought, but if there are not readily available on the market, and there is a lot of brickwork that needs to be done, by using your own creativeness you can make one yourself, all that is needed is a straight edge marked with the gauge that you can fasten to the walls.

There are at least two types of profile that the bricklayers can use to speed up his work, the main one is used for external corners. This external corner profile needs to be supported both ways to be effective, so, if you haven’t got one and you cannot buy one, you need to configure a device that can be tighten both ways, when you are making your own profile. You have to plan it in such a way that you can grab a brick from the joint on one side and two bricks on the other side, so that a sort of triangle is made and balance can be kept.

The internal corner profile can be a lot easier to make, and here I wonder why people don’t use it, since it is easier to make. All what is needed is again a straight edge with a hole or a few holes drilled in it and a special made up bolt or two that are thinner than the brick’s joint; these special bolts need to be modified and instead of their normal bolt head they should have a short cross say 30 to 40 mm welded at one end, and at the other end is the tread with a butterfly nut. All the bricklayer needs to do now is to leave a hole in the bed joint near the corner, or clear the joint with a plugging chisel, then he puts one of his bolts in the hole of his straight edge; now he can push the bolt in the joint until the modified bolt head reaches the other side of the brick, then he turns the whole bolt 90 degrees, so that the modified bolt head is now vertical, and then he can tighten the bolt with his butterfly nut and at the same time make sure that the profile is plumb and he can use this profile instead of building the corner with his spirit level.

---------------------------------------

To complete the brick base

What else needs to be done to complete the brick base?

Let us now assume, that because the ground is sloping the base of this house has been divided, in such a way that the lower end can be used for garage laundry and utility room. To achieve that they have dug up the ground level about half the length of the house, and then dug a foundation to support a retaining wall and pillars to support the house above, the rest of the ground under the house will be left the way it is for the time being, because it is too costly to dig it out.

Anyhow, let us complete this brick base, as we have said above the lower side is now a certain height where the windows openings should be started. The windows are going to be tied to the brickwork, so, they need to be put in the right place and braced while the walls are being built. The bricklayers need to be careful that the windows remain plumb and in the right place while he attaches the window ties to the window and builds the tie into the brickwork. Here I may have to point out that placing the windows on the walls at the right height and at the right place, it’s one of those jobs that in this part of the world there is no rule who has to do it, say if the bricklayer is paid a fixed price for the amount of bricks he has laid, when he is placing and fixing the window on the wall he might not be paid, therefore, nobody is willing to do it, but there is no set rule and not much money for doing it, therefore, everybody wants to pass the buck to the builder or other trade people.

Having said that, now let us assume that everything has been done according to trading practice and the windows have been built into the brickwork accordingly. But here I want to point out that we have not talked about the lower part of the brick base that is being built on the higher part of the land, so, what needs to be done there?

The lower part of the brick base is built together with the rest of the base, but because it is lower it can be just one single brick thick with engaged piers under the house. These engaged piers may have a double purpose, one is to strengthen the walls and they may be used to carry the weight of the house if this part of the house is going to be a brick veneer. In this part of the house because there are no windows the bricklayer needs to leave some air vents, so that a minimum of ventilation is achieved. All this is going to be done according to specifications, as there must be some local rules and they may not be the same everywhere.

What we have written in this article is approximately what happens when we bricklayers build a brick base on a slopping piece of ground. So, I hope that I have not left behind any important description that would have helped the readers.

Now that we have built our imaginary house brick base, we believe that we have said enough in this article. So, see you soon in our next article, building a veneer house.

See you soon.

----------------------------------  

This blog-site is; old man-lifeworks

 Blog, Completing the house brick base  

IS TO BE CONTINUED WITH

Building a veneer house    

See you soon.

---------------------------

I believe that on the internet, it is  helpful if we keep our personal links handy, so that we can visit our sites from anywhere we are. These links hereunder are some of my links, feel free to visit them. 

http://diybrickwork.com  

 http://manneedsgod.co.uk

http://frankmenchise.com

https://sites.google.com/site/menfrancoreconciliation/

https://sites.google.com/site/prayersofreconciliation/

https://sites.google.com/site/godintheuniverse/

------------------------------------------ 


Tuesday, February 9, 2021

Building a house brick base

Dear readers, we are writing these posts, because we want to write some D.I.Y. Brickwork and building posts, so that you can learn something about how to built something yourself, at least in
theory. So, keep reading please. 
You are here, http://oldman-lifeworks.blogspot.com

My other sites; http://frankmenchise.com,http://diybrickwork.com,http://manneedsgod.co.uk  

Anyhow, you can see our entire articles at this addresses, DIY brickwork  

 and,  http://diybrickwork.com


Houses can be built with different materials, most times a house can be part bricks and part timber, like the one here, a brick base and a timber house above. Anyhow, in this blog we want to start the house building a brick base.  



We start the house by digging and concreting the foundations first. On a narrow sloping site the foundation can be like this one above. But let us start how to proceed laying bricks.  


Welcome to our blog, Building a brick base

Dear readers, in our last article, we wanted to tell you how to build a brick base, on a sloping site. I believe that the best thing to do is to talk in a way, as if we are building this house brick base step by step, so, let us start building it.

When we want to build a house, it is necessary to have a plan, but because we don’t have a plan, let us say that we are building a rectangular house base, which is about 8 meters wide and 12 meters long, it happens to be built on a sloping site.

Now, the foundations have been laid, and there are several concrete steps in it, because, of the slope in the land. So, the bricklayers need to pay more attention to the foundation levels. They cannot lay bricks and follow the foundations, set by the concrete workers, because they may not be level. In building every tradesman is responsible about his own work, so, it is wise to be careful that you don’t make mistakes, and if the trade before you have made a mistake try to adjust it, without making too much fuss if you can.

In the case of a stepped foundation, it is hard for concrete layers to set the concrete steps of the foundations at the right level, for the bricklayers to lay bricks on them without checking the levels, one of the reasons is that the steps in the concrete foundation may not be the same gauge of the brickwork that we are going to lay.   

As we have explained in our previous article about levels, we have already marked the level on the profiles and stretched a tight line above the southern brick wall; from this level line we can check the levels on the southern brick wall. 

Now, to make things easy let us start with one working bricklayer, and let us assume that the bricklayer has marked the outside boundary corners and has started to lay a few bricks on the lowest corner of the foundation; he is building a corner four bricks high. He has chosen to make the corner four brick high, because from his measurement he knows that there is a difference of three bricks in the foundation, therefore, his fourth brick on the corner that he is building now, is going to be level with the first brick on the opposite corner, having built his corner four bricks high and having laid his firs brick on the other corner, now he can stretch his brickies line between these two points and start working his stretcher bond from his lowest corner, making sure that the bricks he lays are laid in line and level. 

Let me explain, in bricklaying it is important that the entire building is set in stretcher bond from the start, even if there are other types of bonds that are going to be used in the brickwork, because the stretcher bond is always the main bond, as this bond will continue throughout the building; therefore, the bricklayer cannot build the other corner until he runs a full course in stretcher bond from the first corner that he has built at the start, once that is done he can proceed to build both corners.  

  

A bricklayer working on a brick wall. As we have said, bricklaying is a hard job, but the hardest part is to start the brickwork the right way. As we will explain in the following descriptions, 

--------------------------------

How we proceed to build the brick base 

Now, to give an easier description let us say that the lowest corner of the house is the South East corner, the South West corner is three bricks higher than the South East corner and the other corners are higher than these two corners. Now as I have said the bricklayer has built this corner four bricks high and laid one brick at the west corner as marked, so, he is ready to lay brick, but before he does that he double check everything with his gauge rod, he checks from his line level that he has set above, or with the water level that his fourth brick in the corner is level with his first brick on the west corner, let us assume that they are level and they are the same course of bricks.

Now he can start laying brick in stretcher bond, from the South East corner working his way to the west corner, he sets his brickies line as he sees fit making sure that the levels and the alignment are right, when he reaches the fourth course, which is the first full course in this wall he tries to work out if he can start this whole wall in stretcher bond, without cutting any bricks by increasing or decreasing the perpendicular joints between the bricks, if he cannot achieve that, then one brick must be cut a bit shorter; small pieces are to be avoided as they are unsightly and they weaken the wall. While doing this job, one has to keep in mind that in a face brick wall the perpendicular joints become unsightly if they are bigger than the bed joint, therefore, it is better to keep the perpendicular joints smaller than the bed joint.

Now that the first course of bricks in stretcher bond has been laid from corner to corner, the bricklayer will lay bricks in the inside of this brickwork, if it is just a one brick thick wall he will lay the bricks right against the bricks he has already laid, but if it is a cavity wall then he has to set his inside wall as specified, most time this space between the walls is about 50,mm. Now that the lowest wall has been set, he moves to work on the eastern wall, since this is the second lowest wall in this brick base.

----------------------------------

Working on the eastern brick wall

The eastern stepped concrete foundation is a longer foundation and it has a difference in level of about 1.2 meter and this will be about 15 courses of bricks.

First, the bricklayer stretches the external line and a level tight line above the eastern wall, from these two lines he can check the outside alignment and the levels, then he checks and lays his first brick on the foundation near the first concrete step, as he has a four brick high corner he can lay one to four brick next to the concrete steps. I must say here that it is hard to explain just by writing a text to show exactly how everything is done, but in building everything is common sense, so, use your imagination to see how things can be done.

Anyhow, let us assume that the bricklayer has set his bricks and now he is running his stretcher bond, from the south eastern corner to the north eastern corner of the house and the fourth course of bricks has been laid and the inside brick has been laid. At this point of time the bricklayer needs to build the south eastern corner higher to proceed with the works, unless another bricklayer is doing that for him. You see, I am writing this article as if there is a single bricklayer on the site at the beginning, but I am doing that because that is the only way to show you how we can start this brick base correctly.

Anyhow at this point of time the bricklayer wants to add a couple more courses on the walls that he has started, so that his walls in this corner are higher than the ground and the trench then can be back filled at this corner of the house, so that it is easier for him and everybody else to work on level ground.

But before he does that, he knows that he must check what else needs to be done, he notes that there is an opening for a door after he lays another two or three courses of bricks and that he needs to reinforce his brickwork with some brick mesh reinforcement before the opening occurs, and there is also a damp-course to be laid at the opening level, this damp-course is only needed in this lower part of the base, because they are going to lay a concrete floor and build a couple of rooms under the house. The damp-course is a thin layer of material that stops the dampness passing from the ground up and from one level to another; it works both ways depending on the way it is laid.

 In the specifications says that the reinforcement is needed every four courses and under and above all openings. So, he lays his mesh reinforcement on the walls and builds another corner three brick high, this is the level where the first opening occurs, it is also the level of the damp course. Here we need to note that to make it easier to understand what is happening, this south eastern corner is now seven bricks high form the foundation, at this point of time it is better that all the brickwork in the base is built to this level.

Once you have all the brickwork level, the damp-course is laid according to the specification, and the first problem is solved in this lower part of the brick base. So, now the bricklayer/s can start building higher corners, as they did when he started, or if they want they can set bricklayer profiles if they are available, since now the brick walls at this lower end of the house are set at the right level and alignment.  

----------------------

Bricklaying for a house requires team work

On the above written explanation, we have assumed as if there was only one bricklayer on the job, but to build a brick base a small gang of bricklayers and labor/s are needed, say two or three bricklayers and a labor. Sometimes there are no strict rules on the job, and they can help each other. Mind you this can only work with small gangs, and the bricklayer foreman is there to guide the team and help whoever needs help. On large team everyone has his own job to do, and when the unions have a say, they want you to do only your own job and nothing else, so, sometimes the unions are not helpful, but then again they need to have their own rules otherwise they cannot exist.

Anyhow, let us go back to building this house brick base; now that the first part of the base has been started, the bricklayers must be careful to start the rest of the base correctly, so, they continue to lay brick and check for levels and alignments’ as they have done before, by building one wall at a time and a course at a time, until they bring all the brickwork level with the first brick on the foundation on the highest corner of the house foundation, here again everything must be checked and rechecked again, to make sure that everything is level and set at the right alignment and above all that there is no pig in the brickwork. To make sure there is no pig in it; all the walls must be built at this level and checked, and then proceed to build everything to the finish height required.

I believe that this article has become too long, because of the explanations that are required, so, it is better if we write another article, and talk about what is going-on on the work site, while we are building this house brick base, and explain what is meant by a pig in the brickwork.

To make it easy for you to follow, this is the link to our article, House brick base continues

See you soon.    

------------------------------------------

This blog-site is; old man-lifeworks

 Blog, Building a house brick base  

IS TO BE CONTINUED WITH

Our house brick base continues    

See you soon.

---------------------------

I believe that on the internet, it is  helpful if we keep our personal links handy, so that we can visit our sites from anywhere we are. These links hereunder are some of my links, feel free to visit them. 

http://diybrickwork.com  

 http://manneedsgod.co.uk

http://frankmenchise.com

https://sites.google.com/site/menfrancoreconciliation/

https://sites.google.com/site/prayersofreconciliation/

https://sites.google.com/site/godintheuniverse/

------------------------------------------ 

Sunday, February 7, 2021

D.I.Y part 4, How to start the brickwork level

Dear readers, we are writing these posts, because we want to write some D.I.Y. Brickwork and building posts, so that you can learn something about how to built something yourself, at least in theory. So, keep reading please. 
You are here, http://oldman-lifeworks.blogspot.com

My other sites; http://frankmenchise.com,http://diybrickwork.com,http://manneedsgod.co.uk  

Anyhow, you can see our entire articles at this addresses, DIY brickwork  

 and,  http://diybrickwork.com,


Block or bricks must be laid level and plumb, and bricklayers need to pay attention, when they build their corner, especially if they are working on a sloping and uneven site. 

How to start the brickwork level

Dear readers, in our previous blog we have talked about levels, and then we had to mark on the foundation where the walls are. So, now that we have marked all the corners, we can start building this brick base on the right alignment, but we need to think about the levels; you see 99% of the bricks must be laid level and plumb, unless there is a specific reason for the walls to be leaning, but this does not happen when we build houses.

Anyhow, to start the brickwork level, we need to know if the two opposite corners are level, and if they are not, what is the difference between them, so that we can start the brick walls at the right level. With short walls it is enough to use the spirit level to do everything, but with longer walls we need to use other sophisticated levels. Therefore, it is necessary to mark the levels on every corner, so that the difference is known to the bricklayers before he starts laying bricks, because most of the difference must be rectified well below ground level and if possible on the first course of bricks that we lay on the foundation.

Today there are several types of level that we can use, some of these levels are very expensive like surveyors level and other types, they also need an expert to use them and a helper at the other end to mark when instructed to do so, therefore, it is very helpful if one of these levels is being used on the site to mark all the levels around the house base for all the trades that are working on the house, but there are times when the bricklayers are left to their own devises, and they have to work out their own levels.

Now the bricklayers have many tools to carry around including the mixer and wheelbarrows, therefore, they try to avoid carrying expansive levels with themselves even when they know how to use them. So, some bricklayers use even today the water level, because it is a simple and cheap level, as it is only a clear hose filled up with water and it is easy to use, all you have to do is to fill up this hose with clean water and at the same time make sure that there are no air bubbles in it and you have a very accurate level ready to use, as we have explained in our previous blog. 

Let us explain how the clear hose water level works, when you fill the hose up with water, make sure that there are no air bubbles left in it, if there are no bubbles, then the water in the two ends of the hose should always be level, whether they are beside each other, or when they are far apart. So, if you mark the top of a brick on a corner that you have already built you can mark this same level on the other corner, therefore, you know that this two marked points are level; then, you should stretch a brickies line between these two points making sure that the line sits exactly on the mark that you have made; now all the level below this line can be worked out easily from the bricklayer, using a type measure or a gauge rod.

The bricklayer can work out what to do if there is any difference on the foundation, and make sure that it is the same course of bricks by running a full course of bricks between these two marked points, at this stage the bricklayer not only has to take care that the wall is at the right alignment, he also has to make sure that the brick are laid level, and at the same time he needs to make sure about the bond, therefore, the easiest way to achieve that is to start from the lowest corner and lay a full course of bricks until he reaches the other corner, this will make sure that the brickwork is started level and with the right bond. This procedure should now be repeated also on the other walls until all the walls are set up, if everything is done properly we should end up with the last wall being the easiest to start, since we have set both corner to build the other walls, but be careful here that there is not a pig in it, which sometimes can even happen when we are not careful enough and the line is set on the wrong course of bricks.

Explaining what is meant that there is a pig in it and how to make sure that everything is set right from the very beginning. To make 100% sure that everything is level and that there is no pig in the brickwork, it is necessary that you run a full course of bricks all around the building at the same level, if that can be done and there is no brick sticking out it is okay. Now let us see how this can be avoided when we are working on a sloping site and the foundations have several steps in it, because this is the most likely place that a mistake can be made.

------------------------------------------ 


Above is a stepped foundation on a sloping site. On jobs like this the bricklayers must be careful, because it is easy to make mistakes. We will explain this, as we go on writing our blogs. 

Laying bricks on a sloping site

As we have said, the most important thing in bricklaying is that the bricks must be laid at the right alignment, straight, plumb and level, and when building a face brick wall, the bricklayer should pay particular attention to these details, beginning from the first course of bricks that we lay on the foundations, therefore, it is better to concentrate on this single issue, because it is very important to start the brickwork right from the beginning. 


Bricklayer building a corner in stretcher bond. Note that most brickwork is in stretcher bond, and all brickwork must be set in stretcher bond. Because it is the bond that is compatible with other bonds. 
------------------- 
Now, to lay bricks on a level site it is easy; also to lay bricks on a level foundation is easy, you see, you can build another corner as the one shown here at the other end, and by using a brickies line on line blocks you can stretch a tight line and lay bricks in a straight line easily. Of course, here we have assumed that the foundations have been laid level, but on a stepped foundations it is not that easy, because even the concrete workers  may not have been able to lay the foundations level, because the concrete moves until it sets, therefore, the bricklayers need to check and recheck the levels when they start bricklaying on a sloping site. One of the easiest ways to do that is to mark levels on the profiles all around the building site; then you can stretch a bricklayer tight line between these levels and measure from the line down to check your levels, ether with a type measure or a gauge rod.

I know that you are saying, what is a gauge rod? Okay, a gauge rod is usually made from a long-marked peace of timber that the bricklayer marks himself, once he knows what sort of bricks he is going to lay and how thick these bricks are, and what is the best thickness of the joints for this brickwork. I know that the gauge rod sounds like a strange devise for those that are not used to work with bricklayers, but really it is only a straightedge that has been marked with the space of each brick including the joint, so that you can quickly know how many courses of bricks have to be laid in the space that you are measuring.

Let me explain, to decide the spaces on the gauge, the bricklayer Foreman measures the thickness of four bricks that have been laid with an average and attractive joint, and from these measurements he makes his gauge rod for this particular job; here it follows that when the gauge rod is not handy, we bricklayer talk about this space as the gauge that is supposed to be kept on this building site, which is four course of bricks.

Anyhow, I believe that this article is becoming too long, and difficult to understand for D.I.Y for the first time, as there are too many things to keep in mind, and since there is a lot more that can be said about bricklaying, I think that it is better to write another article or two about it; which we are going to call, Building a brick base, or Bricklaying on a sloping site, where we are going to explain in more details how the work must be done and how to avoid to make mistakes.

Please note; these D.I.Y building articles should be read one after the other to make sense. Anyhow, here are links where you can find more explanation together, DIY brickwork,, and http://diybrickwork.com, and this is the link of our next building article. Building a brick base

See you soon.

----------------------------------------

This blog-site is; old man-lifeworks

 Blog, D.I.Y brickwork part 4, How to start the brickwork level.  

IS TO BE CONTINUED WITH

Building a house brick base    

See you soon.

---------------------------

I believe that on the internet, it is  helpful if we keep our personal links handy, so that we can visit our sites from anywhere we are. These links hereunder are some of my links, feel free to visit them. 

 http://manneedsgod.co.uk

http://frankmenchise.com

http://diybrickwork.com 

https://sites.google.com/site/menfrancoreconciliation/

https://sites.google.com/site/prayersofreconciliation/

https://sites.google.com/site/godintheuniverse/

------------------------------------------ 



Saturday, February 6, 2021

D.I.Y part 3, Explaining levels and the spirit level.

Dear readers, we are writing these posts, because we want to write some D.I.Y. Brickwork and building posts, so that you can learn something about how to built something yourself, at least in theory. So, keep reading please. 
You are here, http://oldman-lifeworks.blogspot.com

My other sites; http://frankmenchise.com,http://diybrickwork.com,http://manneedsgod.co.uk  

Anyhow, you can see our entire articles at this addresses, DIY brickwork  

 and,  http://diybrickwork.com,





This devise above is a surveyor level that most large firms should have or hire, because in building it is important that you know the levels of what you are building, of course you need to know how to use it. But there are many other types of  simpler levels, as we are going to talk about in this article.   

Now, let us talk about the water level, which is a simple and cheap devise, since it is only a clear hose filled up with water, as shown in these pictures 




To understand the water level, you have to think that the water is always level; so, if you fill it up with no bubbles in it, the two ends are always level, and you can you this device to mark your levels. 

Now let us explain the spirit level

The bricklayers need many tools to do their job well, and they should know how to use them properly; the two most important tools are the trowel and the spirit level, without these two tools the bricklayers cannot work. So, hereunder let us explain how to use them properly and above all let us check the spirit level, as I have seen some D.I.Y make mistakes, because they do not know, how to check if their levels and if their spirit level is right. 

So, in this article let us assume that anyone can easily learn how to use the trowel, since the trowel is like a big flat spoon that picks up the mortar and lays it on the bricks or sticks the mortar to the bricks, it is also used to tap the brick to the right level and the right place and a good bricklayer can use it also to cut some types of bricks, all these action of the trowel are easy to understand and slowly one can learn how to use it, but the spirit level is not as simple, therefore, let us see how to use the spirit level, and above all how to check that your spirit level is working right. 


A bricklayer must have a good quality trowel and know how to use it.  

Most bricklayers use a 4 foot spirit level, most of these modern levels have three bubbles in it and they are very accurate, the two end bubbles are for plumbing (reading if the walls or posts are exactly vertical) the central bubble is for reading if the walls or whatever are level. But what about if these bubbles for some reason have gone out of their proper settings and when you read them, they give you a false reading? 

This spirit level above is one of the levels that most bricklayers will use, but let us explain. 

Any good tradesman that uses these levels must know how to check if they are right or not, but let us assume that our readers are not tradesman, so, they want to know how to check if the level they are going to use is okay? To check if your level is okay you should do the following:

First let us check the plumb bubbles; to check the plumbing bubbles, pick up your level, chose a post or wall that you think is strait and plumb, put one side of you level right against it and while lightly pushing against it check that the level touches evenly the surface you have chosen, if it does then without moving it look at the bubble level if it is right in the center, if it is right in the center then it is plumb, but to make sure that it is plumb you need to turn your level around 180 degrees in such a way that the face of the level that is now against the wall is away from the wall and the other side is against the wall, if here again the bubble is exactly in the center then you know that that part of the wall you have chosen is plumb, and you also know that the bubble in your level is set right since you have compared it to the other side of itself.

Now that you have done that, turn your level upside down, so that you can check the other plumb bubble, if this bubble is also set right, the bubble should again be in the center just like the other bubble, and when you turn you level around as before it should again be in the center; but if it is not then this bubble is out and should not be used for plumbing.

Okay, we have checked the plumb bubbles and we are now going to check the level bubble, to check the level bubble, pick up your level, chose a wall or a bench that you think is level and do the following, place the level on it and if it the bubble level is in the center then it is level, now you need to check that this bubble is really right; so, you need to make sure that you check this bubble against itself; in order to do this mark exactly where your level is; then turn your level around 180 degrees so that the end that was on the west side is now on the east side and the end on the east side is now on the west side, if the bubble reading is again in the center as before your level is set right and you can use it. But if it is not then you might have to buy a new level. What we have written above is common knowledge to good tradesman. Now let us get ready how to lay bricks. 

 
This photo above shows you how the profiles are set, if the profile can be set level, then they can also be used to start your brickwork level, otherwise you have to work it out yourself. 


Getting ready to lay bricks

As we have said in our previous articles, when you have to start building a house, the first thing that is necessary to do on a building site is to set up a profile, to make sure that the house is set where the house plan says it should be, therefore, a profile must be there before you start laying bricks. Now to make things easier let us assume that the profile is already in place.

So, let us explain the procedure when we start working on this brick base. First, we bricklayers go to the profiles and tie the end of the bricklayers’ line, on the outside alignment of the house, then walk to the opposite side while unrolling the line and tie it in the same position. Here I need to point out to the D.I.Y for the first time that the line must be stretched very tight, so that it stays in a straight line even if there is a wind blowing. Now that we have set the first line, we are going to set another line right across the first line and where these two lines meet, is the very first corner of the brick wall of the house.

Now with a plump bob or a spirit level mark on to the foundation where the outside corner of the first brick is going to be laid, and you are ready to lay the first brick. Of course, it is necessary to repeat this procedure for every corner of the house. It is also necessary or helpful when the foundation of the house is not level to mark all the steps, so that you know that the wall is exactly in the right place; you see to start laying bricks in the foundation is a very hard and demanding job for the bricklayers, let us imagine that you have to lay bricks below the level where you are standing, and where you are standing is uneven ground and if you are unlucky it might even be wet. So, if you can make everything easier by marking all the critical points it helps. This of course, is only step one to ensure that the brick walls are going to be in the right place, and step two is about levels, so, let us see how these two critical things can be done together. 

Anyhow, I believe that this blog is becoming too long, so we are going to describe that in our next blog, starting the brickwork level. See you soon. 

-------------------------------- 

This blog-site is; old man-lifeworks

 Blog, D.I.Y brickwork part 3, levels and spirit level.  

IS TO BE CONTINUED WITH

D.I.Y, Part 4, how to start the brickwork level.    

See you soon.

---------------------------

I believe that on the internet, it is  helpful if we keep our personal links handy, so that we can visit our sites from anywhere we are. These links hereunder are some of my links, feel free to visit them. 

 http://manneedsgod.co.uk

http://frankmenchise.com

http://diybrickwork.com 

https://sites.google.com/site/menfrancoreconciliation/

https://sites.google.com/site/prayersofreconciliation/

https://sites.google.com/site/godintheuniverse/

------------------------------------------ 

World views diary November 2024

WELCOME TO OUR BLOG YOU ARE INVITED, TO BROWSE AS LONG AS YOU LIKE. Anyhow, here I will publish my own diary and what I see happening in the...